The first office was opened in 3D-printing 2016-06-08 11:31:52 / CONFERENCES

Recently, the construction of buildings in Dubai with the help of 3D-printers were informed about the strategy. It was noted by the authorities in Dubai by 2030, 25 percent of all the buildings will be printed. Published in the city center "office of the future" The opening was the first step in this direction.

 

According to nanonewsnet.ru details the process of printing a single-storey building with an area of ​​250 square meters and 140 thousand dollars was spent on the construction of 17 days. In the same building twice more funds for the construction of traditional methods is required.

 

For the construction of the building is 36 meters in length and width of 12 meters, a height of two floors were used printer. After printing out the details of construction were collected by a team of 17 workers. Printed office electricity, water pipes and air-conditioning system is equipped with telecommunications equipment.

 

United Arab Emirates (UAE) Prime Minister Sheikh Mohammed bin Rashid Al Maktoum said at the opening of the office of the "office of the future" modern construction model and demonstrates the use of technology in people's lives in the future. In his view, the advantages of 3D-printing, allowing efficient use of this technology in the future, the UAE will become one of the significant and sustainable economic centers.

 

The Future Fund is a unique office in Dubai (Dubai Future Foundation) will be the temporary headquarters. The future will be transformed into a museum in 2017.

    Copyright © İnformasiya Texnologiyaları İnstitutu, 2024